DEVELOPMENT OF NEW ASH POND AT TG. BIN POWER PLANT, PONTIAN JOHOR

Client Tulane Sdn Bhd
Location Johor, Malaysia
Scope Of Work Detailed engineering design and Construction supervision

Project Detail

Tanjung Bin Power Sdn Bhd (TBP) is currently operating and managing the 3 x 700MW

Coal Fired Power Plant at Tanjung Bin, Johor. It is located on Lot PTD 1769,

PTD 1770 at Tanjung Bin, Mukim Serkat, Daerah Pontian, Johor.
The existing Ash Pond of the Power Station is expected to be completely filled

up in the near future.TBP intends to construct a new Ash Pond to cater for the disposal of ash by inviting

Proposal for design, construct all necessary ash dyke, monitoring wells suitable

membrane at the slope and bed of the Ash Pond, Pump Station, Pipe Sleepers,

Pipeline and all necessary relevant works for the new Ash Pond and Secondary

Pond at the existing 3 x 700MW Coal Fired Power Plant at Tanjung Bin.

RM30 million